Delhi High Court
Col. P.K. Uberoi (Retd.) & Anr. vs Vigneshwara Developwell Pvt. Ltd … on 27 January, 2020$~J
* IN THE HIGH COURT OF DELHI AT NEW DELHI Judgment reserved on : 13.5.2019
% Judgment pronounced on : 27.01.2020 + Co. A. No. 509/2018 in CO.PET. 885/2015 COL. P.K. UBEROI (RETD.) & ANR. ….. Petitioner Versus VIGNESHWARA DEVELOPWELL PVT. LTD & ORS. ….. Respondent Present: Mr.Shailendra Singh, Adv. for Vigneshwara Victim Welfare Association.
Mr.Shashwat Jain and Mr.Sandeep Phogat, Advs. in CP 885/2015.
Mr.Arunav Patnaik and Mr.Shikhar Saha, Advs. for Objectors- Mr.S.M. Puri.
Ms.Anju Jain Advocate for Vingeshwara Barter Investors Association.
Mr.Najimuddin Ahmed, Adv. for the applicant.
Mr.R.K. Gupta, Adv. for the objector-Vipin Gupta HUF and Mr.Nitin Gupta, HUF.
Mr.Abhishek Saket, Mr.Shahana Farah, Mr.Rahul Dubey and Mr.Chitral Gambhir, Advs. in CP 885/2015 Mr.Siddhant Tripathi, Mr.Abhinav Mishra, Ms.Nivedita Chauhan and Mr.Karan Nagpal, Advs. for Vigneshwara Barter Investors Association.
Mr.Arunav Patnak and Mr. Shikhar Saha, Adv. for the applicants in CP 885/2015 Mr.Arjun Nanda, Mr.Amitabh Sinha and Ms.Aarzoo Aneja, Advs. for the applicant in CA No. 505/2018in CP 885/2015 Mr.Jay Salva, Sr. Adv.with Mr.Bharat Gupta, Ms.Shreya Rao and Mr.Vishesh Chauhan, Advs. for Investors Sangharsh Samiti CP 885/2015 Page 1 Mr.Sameer Jain and Mr.Angad Sandhu, Advocates for the Service Tax Department.
Mr.Anish Dayal, Mr. Siddharth Vaid and Ms.Rupam Sharma, Advs. for ICT Mr.Kunal Sharma, Adv. for the OL Mr.Anil Grover, Adv. with Ms.Noopur Singhal, Adv. for DTCP,Haryana and HSIIDC Ms.Nipun Kapur, President, VVWA Mr.Ruchir Bhatia, Sr. Standing Counsel for Income Tax Mr.Manik Dogra, Mr.Dushyant Manocha and Ms.Ananaya Ghosh, Advs. for propounders/ex-management.

CORAM:
HON’BLE MR. JUSTICE JAYANT NATH CA 509/2018 in CP 885/2015
JAYANT NATH, J. (JUDGMENT)
1. This application is filed under section 391-393 of the Companies Act,
1956 by the promoters of Vigneshwara Developwell Private Limited and
Vigneshwara Developers Private Limited praying for approval of the
proposed Scheme of Compromise and Arrangement of the two companies
with their respective members and creditors. Against the two companies in
question, namely, Vigneshwara Developers Private Limited and
Vigneshwara Developwell Private Limited winding up petitions were
admitted and order appointing the OL as Provisional Liquidator were passed
by this court on 22.7.2016 in CP No.534/2015 titled Naresh Chand Gupta
and Anr. vs. Vigneshwara Developers Private Limited and in (the present
petition) CP No.885/2015 titled Col.P.K.Uberoi (Retd.) and Anr. vs.
Vigneshwara Developwell Private Limited.
2. It is pleaded that during pendency of the aforesaid proceedings by CP 885/2015 Page 2 permission of this court, the Ex.Management of the aforesaid companies
engaged in mediation proceedings with the creditors. Large number of
settlements have been concluded before the Delhi High Court Mediation and
Conciliation Centre by the authorised representatives with the creditors.
Based on the said settlement terms, it is pleaded that the present revival
scheme has been filed which has been attached as Annexure D to the
application. It is admitted that the promoters of the two companies i.e.
Mr.Sunil Dhaya & Mr.Sanjay Dhayia are in judicial custody in connection
with various proceedings said to have been initiated by unsecured creditors
of the various companies.
3. It is pleaded that the two companies do not have any secured creditors.
A copy of the certificate of the Chartered Accountant has been placed on
record. Last audited balancesheets of the two companies for the year
31.3.2013 have also been enclosed. The class of unsecured creditors to
whom the revival scheme is applicable have also been enclosed as Annexure
J.
4. I may only note that after judgment was reserved and delivery of the
present judgment was pending, NCLT passed an order on 10.10.2019
appointing an Interim Resolution Professional and declared a moratorium
under section 14 of the IBC. The propounders of the Scheme filed a Writ
Petition before this court titled Sunil Kumar Dahiya vs. Union of India being
W.P.(C)11706/2019. This Court disposed of the petition on 8.11.2019 noting
that this court is seized of the revival of the company stayed the operation of
the order dated 10.10.2019 of NCLT until pronouncement of the judgment of
this court or until the matter is decided by NCLAT. NCLAT was requested
to consider the matter including the orders passed by the Company Court.
CP 885/2015 Page 3
5. The NCLAT on 19.12.2019 adjourned the matter to 9.1.2020. The
matter is said to be pending.
6. The present application came up for hearing on 23.4.2018 when notice
was issued on the same to the non-applicants. On 12.10.2018, this court had
noted the submission of learned counsel for the applicant that there are two
projects of the respondent company, namely, Darson and Kisson I Valley
Business Park at Plot No.CP02, Sector 8, Manesar, Gurugram which was
allotted for development of a technology park. Similarly, another project by
the name of Aquarious Business Park has also been developed at Village
Begumpur Khatola, Sector-74, Gurugram. The plea of the learned counsel
for the applicant was also noted that the applicant has entered into
settlements before the Delhi High Court Mediation and Conciliation Centre
with the Investors Sangharsh Samiti (Regd.) who has 523 Members on
4.12.2017. A settlement was also entered into with Vigneshwara Barter
Investors Association (VBIA) which had 250 members and Vigneshwara
Victims Welfare Association who had 300 members. Some individual
agreements had also been entered into. It was pleaded that out of about 1437
unit buyers, 1180 have agreed to the settlement and have signed the
settlement agreements before the Delhi High Court Mediation and
Conciliation Centre. This court noted that as out of 1437 unit buyers 1180
had supported the scheme, 80% of the stated class of creditors have agreed to
the compromise or arrangement. The Court also noted that the OL had filed a
report stating that 41 claims had been received pursuant to the advertisement
published in the newspaper for a total value of Rs.21.47 crores for
Vigneshwara Developwell Pvt. Limited and 25 claims for the total value of
Rs.7.93 crores received for Vigneshwara Developers Private Limited and CP 885/2015 Page 4 that all the claims were received from the allottees/unit buyers. This court
hence dispensed with a meeting under section 391 of the Companies Act.
Notices were directed to be issued inviting any objections from the effected
parties. The applicant was also to put the scheme on the net.
7. Notice was also to be served on the Regional Director, Ministry of
Corporate Affairs, CGO Complex. On 21.2.2019 notices were also issued to
the Income Tax Department, Service Tax Department and Directorate of
Account, State of Haryana. The OL was also directed to file his response.
8. I may first have a close look at the scheme filed. The scheme clarifies
that there are two pending projects of the company. The first is iValley
Business Project which is under the name and style of Darson & Kisson
iValley Business Park at Plot No.CP 02, Sector 8, Manesar, Gurgoan which
has about 10 acres land and was launched in 2007 for development of a
Technology Park on Campus Development Norms. It is stated that
Vigneshwara Developers Pvt. Ltd. has free hold marketable interest for
38,212 sq. metres as per HSIIDC Norms. Construction in the project was
commenced and construction of Tower-C (Venus Tower) and Tower B-I and
Tower B-II to the extent of 75% and 65% are respectively complete. The
remaining towers have been constructed up to the ground floor level. A three
level basement parking for the entire 10 acres stands completed. The
company still has approximately 6 lakhs sq. ft. of the unsold inventory in the
said project which can further go up to another 4 lakhs sq. ft. with approval
of HSIIDC on account of potential increase in FAR. Second Project is
Aquarius Project through the promoters of Vighneshwara Develop Well Pvt.
Ltd. who controls the company Aquarius. Aquarius has rights and
entitlements for development and construction of the said project and CP 885/2015 Page 5 license, approval and receipt from DTCP. This project has six towers. At the
time of stoppage of work in 2014, underground basement up to level 3 has
been completed. This project has approximately 19.5 lakh sq.ft of unsold
inventory available.
9. Regarding settlement, the scheme envisages two different formulas.
One being Formula for Category-1 and one being Formula for Category-2
10. Formula for Category 1 and Formula for Category 2 read as follows:-
“The claims of the Allottees under this category shall be settled for an amount, which is equivalent to his principal amount plus taxes, if any paid by such Allottee, less 40% of the assured return already paid to such Allottee by the Promoters / Companies from time to time (“Formula – Category 1”).

Formula – Category 2:
The claims of the Allottees under this category (“Formula – Category 2”) shall be settled for an amount, which is equivalent to the difference between:
(a) the amount invested by each Allottee in the projects (the principal amount plus any service tax I TDS paid) plus simple interest @ 8.5% per annum calculated up to March 31, 2017 from the dates of their respective payments; and
(b) the amount received by such Allottee from time to time from the Companies and/or the Promoters, as assured return, plus simple interest @ 8.50% per annum calculated up to March 31, 2017 from the dates of their respective payments.

11. It is stated that upon determination of the settlement of amount, each
of the allottees in terms of the Formula as elected by them, their claim would
be settled by transferring/allotting space/FSI on as-is-where-is basis without
any third party encumbrance to the allotttees in either of the projects.
CP 885/2015 Page 6 Regarding the Investors‟ Sangarsh Smiti allottees, as full and final
settlement to the said allottees, the promoters will hand over sanctioned area
on as-is-where basis in the iValley Project. Details are given in the scheme.
Thereafter, the said allottees will at their own cost and through their own
means construct further covered area on the said two towers, namely, Tower
B-I and Tower B-II. The said allottees shall at their own cost and expense
either by themselves or through a third party as they deem fit construct and
develop the said towers B-I and B-II and the area as agreed in Tower-A in
accordance with applicable laws. The promoters will obtain necessary
approvals with regard to construction at their own cost. The promoters shall
at their own cost and expense obtain water, sewerage and electricity
permission and connections.
12. Similarly, the Vighneshwara Victims Welfare Association Allottees
have elected their settlement amount to be determined as per Formula
Category-2. As full and final settlement of the said allottees, the promoters
have agreed to hand over tower marked as Media Max in Aquarius project to
be developed in the proposed drawings of Aquarius Cyber Park I as
described in the scheme. The promoters will get the drawings of the tower of
G+22 approved from the competent authorities. The tower once completed
will comprise 5,99,000 sq. ft. The cost of construction will be borne by the
allottees. They may enter into a collaboration with any developer for the
purpose of developing Media Max Tower. Promoters will apply for renewal
of the license and will make best endeavour to get the approval within 90
days of the sanction of the scheme. The promoters shall also pay stamp duty
and get the property/development rights registered directly by the original
collaborator/land owners. Certain obligations are also put on the CP 885/2015 Page 7 Vighneshwara Victim Welfare Association.
13. Regarding Vighneshwara Barter Investors‟ Association, each of them
has elected settlement according to Formula Category 1. As full and final
settlement to the said allottees, the promoters will collectively allot the entire
tower C (G+12 referred to as Venus Tower) in iValley project to the said
Association on account of as-is-where-is basis. Structure of the Venus Tower
is complete, however the inner partitions/walls, flooring, finishing, etc. are
yet to be completed. It has a covered area of 2,65,151.23 sq. ft. The dues of
HSIIDC and certain other government dues shall be cleared by the promoters
along with other dues of any statutory authority within 90 days from the date
of sanction of the scheme.
14. There are allottees who are not members of any association or have
not initiated any claims against the company. They shall be entitled to seek
settlement of such right/claim by electing to be part of any of the formulas
either of Category 1 or Category 2 and the settlement amount by applying
the elected formula shall be settled by the company by way of transferring
appropriate area in any of these projects. Other details are stated in the
scheme.
15. Pursuant to issue of notice inviting objections, number of objections
have been received from allottees/unit buyers. I may note the salient
objections raised to the scheme in question.
16. One set of objections have been filed by an Association i.e.
Vigneshwara Victims Welfare Association who state that they have 400
members who have invested their hard-earned money in the said two
companies. It is pleaded that the Scheme is a total eyewash as the source of
funds to fulfil the demands made in the Agreements made by the two CP 885/2015 Page 8 companies are non-tangible. The following objections are raised:-
(a) It is pleaded that the two companies must come out with clear and
concrete source of money which is required to be paid to the Director, Town
and Country Planning, Haryana to get the license renewed and to get the one
acre land transferred in the name of the applicants.
(b) It is further stated that there is no statement as to how the basic
infrastructure such as sewage, water and electricity etc. which will cost
money is going to be organised.
(c) There are various miscellaneous permissions which are also required
for the purpose of revival of the project like charges to be paid to the
authorities of which there are no details.
(d) It is stated that as per the settlement, one acre of land was agreed to be
given to the objecting association. However, it is stated that this has no
relevance if the applicant companies do not complete the project as the
power given to the association has a major percentage of area which can be
built as a part of the entire project and not on a stand alone basis.
(e) It is further stated that the Ex.Directors have purchased assets in the
name of other group companies by using investors‟ fund. The OL should
take over all the assets of the said companies and utilise them to fulfil the
commitments as per agreements. The list of 19 such companies has been
filed alongwith the objections.
(f) It is stated that false calculations of the projects have been given in
paragraph D of the scheme.
(g) It is further stated that the aforesaid companies have
promoters/Ex.Directors who have failed to disclose any concrete and reliable
source of funds till date on the basis of which the scheme is sought to be CP 885/2015 Page 9 projected.
17. Three investors, namely, Group Captain S.M.Puri,
Mr.S.N.Dasmahapatra and Mr.G.K.Uberoi have also filed their objections
separately.
(a) They state that they have bartered their properties with group entities
of Vigneshwara Group in lieu of allotment of units in the proposed projects.
They were owners of certain properties and by an agreement had parted with
the above property to one of the group companies of Vigneshwara Group. In
return, as consideration, they were to receive space in the proposed
buildings. It is stated that the objectors are pursuing the individual cases
before appropriate courts in Gurugram against the said group companies of
the Vigneshwara Group for cancellation of the sales of their respective barter
properties. The said group companies are not before this court in the winding
up proceedings.
(b) It is further stated that the project in question failed to abide by the
Real Estate (Regulation and Development) Act, 2016.
(c) It is further stated that the Scheme envisages the companies
transferring areas to investors association and these associations are
responsible for development of buildings and allotment of space to
individual members. It is stated that the promoter would be unable to obtain
the said registration in respect of the projects and the same would not be
RERA Compliant. Hence, such a Scheme would be illegal.
(d) It is further stated that multiple investigations and criminal
proceedings are pending against the promoters of the Vigneshwara Group. It
is pointed out that on 12.7.2017 Central Government has directed the SFIO
to conduct an investigation against the Group Companies of Vigneshwara CP 885/2015 Page 10 Group under section 212 read with 210 of the Companies Act, 2013. Further,
it is stated that there are multiple criminal proceedings pending against the
Vigneshwara Group including proceedings pending with the Enforcement
Directorate under the Prevention of Money Laundering Act, 2002. It is stated
that the promoters of the Group have been laundering money from the funds
raised from the public for acquisition of personal assets. The said
propounders of the Scheme are habitual offenders and have caused grave
loss to public at large. The proposed scheme, it is prayed, is not workable
and is a fraudulent exercise being undertaken to have the promoters released
from custody, pursuant to which there is grave risk that they will abscond.
(e) It is stated that the scheme contemplates disposal of the bartered
properties which are owned by entities affiliated with the promoters for
financing the revival scheme. The objectors herein are pursuing the cases for
cancellation of sale of the bartered properties. Hence, the Scheme is not bona
fide. Their group companies constitute separate legal entities and their assets
cannot be illegally brought within the purview of the winding up
proceedings.
(f) It is stated that the scheme assumes that all statutory authorities will
grant the required clearances for the projects to be developed. It is pointed
out that the license for the Aquarious projects issued by DTCP, Government
of Haryana has expired. The Developers have been blacklisted by the
Department. Similarly, in relation to ivalliy Project, over 10 years have
elapsed and the project has not been completed. Hence, it may not be
possible for the promoters to seek any further extension of time to execute
the project.
(g) It is further stated that the approvals from statutory/regulatory CP 885/2015 Page 11 authorities will require prior sanction of such authorities as well as payment
of transfer charges including clearance of all pending dues. It has not been
demonstrated as to how such approvals will be taken,
(h) It has been stressed that the promoters/companies lack the financial
capacity to execute the scheme.
18. Wellone Wash and Clean Services Pvt. Ltd. have also filed their
objections to the Scheme. It is stated that the debtor company Vigneshwara
Developwell Private Limited owes a debt of Rs.21,87,782 as on March 2018
on account of maintenance services. Objections are being filed on the
ground that the name of the applicant is not included in the Scheme of
Settlement.
19. Objections have also been filed by Nitin Gupta, HUF through its Karta
Nitin Gupta. Particularly, the following objections have been raised:
(a) No General Meeting of Buyers or Creditors was called which is
mandatory under section 391(1) of the Companies Act.
(b) The respondent company has not filed list of creditors/unit buyers and
their valuation of the credit so that the actual number of 3/4 th of the value of
creditors could not be ascertained.
(c) It is stated that as per the proposed revival scheme total allottees of the
project are 1550 and supporters of the Scheme are 1050 allottees. Hence, the
criteria of 3/4th of total allottees of the scheme supporting the scheme does
not follow.
(d) It is stated that the respondent company has purchased a number of
valuable immovable properties situated in Gurugram and other places in the
name of his promoters and respective affiliates/associates. The list of 22
affiliates/associates is stated in the objections. These properties have been CP 885/2015 Page 12 purchased with the precious funds of the investors.
20. Objections have also been filed somewhat on the above grounds by
various entities including Sh. Naresh Chand Gupta.
21. I have heard learned counsel for the parties.
22. Learned counsel for the objectors have reiterated their objections to
the scheme. They have also relied upon judgment of this Court in M/s JVG
Leasing (Securities & Finance) and Ors, (2008)144 Company Case 780 to
contend that where the proposed scheme is not viable or worthy of
consideration this court should reject the same.
23. I may now deal with the objections.
24. Essentially, the Scheme revolves around two aspects. It deals only
with allottees of flats/space. Allottees can be termed to be a class of creditors
within section 391 of the Companies Act, 1956. This is so as they can be
said to be a homogenous group with commonality of interest. The allottees
are to be given space/unencumbered space in the semi-built/un-built areas.
The construction is to be completed by one of the three named associations,
namely, the Investors Sangharsh Samiti, Vighneshwara Victims Welfare
Association and Vighneshwara Barter Investors Association. Those of the
allottees who are not associated with any of the associations have the option
of joining any of these associations. These associations have been given a
right to enter into collaboration agreements and complete the construction.
25. The majority of objections centre around three facets. Firstly,
mobilisation of funds, namely, as to whether the promoters would be in a
position to mobilise funds to be able to get necessary statutory
permissions/permission from DTCP, HSIIDC, etc. The second lot of
objections is that the Scheme is nothing but a fraud by the promoters to try CP 885/2015 Page 13 and get released from their present detention in judicial custody on the plea
that the court has approved a revival scheme. Thirdly, it was stressed that the
Scheme does not have the requisite approval of 3/4th of value of creditors.
26. I may first deal with the issue of mobilisation of funds.
27. It has been strongly urged by the objectors that there is no clear and
concrete source of money which is required to be paid to various statutory
agencies including Director of Town and Country Planning. The promoters
of the scheme have sought to clarify this aspect. The promoters of the
scheme have pointed out that an escrow account has already been opened
with the Registrar General of this court. The escrow account has a balance of
Rs. 2.71 crores. A sum of Rs. 1 crore also stands deposited in this court in
various winding up petitions. Further a sum of Rs.1.10 crore would be
remitted by the propounders from their personal fund. Rs.1.44 crores is said
to have been attached by various orders of the court. Further the propounders
would liquidate Rs.1.5 crores from the fixed deposits held by sister
companies. Further it is stated that the propounders can leverage unsold
inventory. The iValley project has approximately 6,00,0000 sq.ft. of unsold
inventory. The Aquarius project has approximately 19.5 lakhs sq. ft. of
unsold inventory. It is admitted that DTCP has raised a demand of Rs. 44
crores in December 2018.However on audit reconciliation this demand
comes to Rs. 19.44 crores as principal and the balance amount is towards
interest and penal interest. After allowing benefits of policies after
reconciliation, it is claimed that an amount of Rs.26.06 crores (approx.) will
remain due and payable to DTCP. Similarly, HSIIDC has raised a demand of
Rs. 32 crores in July 2018 towards enhanced charges. It is claimed that this
is a miscalculation of land enhancement charges and on correct computation, CP 885/2015 Page 14 an amount of Rs. 18.5 crores would be found due to HSIIDC. It is claimed
that disposal of unsold inventory will generate a fund of Rs. 250 to 350
crores in the course of 12 months. Above is the stated mechanism for raising
funds for the revival scheme.
28. It is obvious that the promoters or the company doesn‟t have ready
cash to show for the full scheme. Perhaps if they had the ready cash, the two
companies would not be in the present plight. I may only observe that the
undisputed fact is that the respondent company has approximately 6 lac sq.ft
of unsold inventory in i-Valley Project and approximately 19.5 lac sq.ft. in
Aquarius project. Some amount of cash is lying deposited in various
accounts. Though it is probable that the full amount as claimed by the
promoters of the Scheme may not be fully available to the promoters of the
Scheme. However, in my opinion, once the Scheme is approved by the Court
the propounders may be in a position to mobilise resources based on unsold
inventory and to generate funds. I also cannot help noticing that out of 1437
allottees 1180 allottees have agreed to the Scheme voluntarily before the
Delhi High Court Mediation and Conciliation Centre. As noted by the
Supreme Court in Meghal Homes (P) Ltd. Vs. Shree Niwas Girni
K.K.Samiti and Ors., (2007) 7 SCC 753 this court is not to sit in appeal over
the commercial wisdom of the majority of class of persons who with their
open eyes have given their approval to the Scheme. I hence reject the
contention about the revival scheme being bereft of any chance of success in
the absence of any proved financial capacity of the propounders of the
Scheme.
29. The next plea raised is that the Scheme is nothing but a facade by the
promoters to try and get themselves released from the present detention in CP 885/2015 Page 15 judicial custody. I would not like to comment on the said objection. The
courts dealing with the criminal matters would be the best courts to decide
on the issue of bail or no bail to the said promoters. I would not like to pass
any observations on the same.
30. As far as the plea about lack of support of 3/4th majority of unit-
holders is concerned, in my opinion, the plea is misplaced. This court on
12.10.2018 had based on submissions made by the parties concluded that the
scheme has the support of a majority in number representing 3/4 th in value of
the creditors. This order dated 12.10.2018 had not been challenged in any
form. No objections or review has also been filed to state that this court had
come to an erroneous decision that the scheme is supported by a majority
representing 3/4th in the value of creditors of the class of creditors.
31. Even otherwise, as per the Scheme propounded there are total 1437
allottees of space which have been sold, 1180 number of allottees have
entered into agreements with the promoters of the Scheme before the Delhi
High Court Mediation and Conciliation Centre. It is clear that the number
who have entered into a Settlement Agreement cross the figure of 75% of the
said allottees. The above figures are sought to be challenged at this stage. In
my view there are no basis for this challenge.
Accordingly, I do not find any merit in the said contention raised by
some of the objectors and the same is rejected.
32. There are couple of more objections which I may note. Objections
have been filed by Group Captain S.M.Puri, Shri S.Dasmahapatra and Shri
V.K.Oberoi. It is their case that they have bartered their property with the
respondent entities in lieu of allotment of units in the proposed projects.
They have initiated suits in the appropriate courts in Gurgaon against the CP 885/2015 Page 16 group companies of Vigneshwara Group to whom they had handed over their
properties for cancellation of sales and for barter of their respective
properties. As the present respondents companies are not involved in the said
litigation, in my opinion, the said objection cannot be an impediment to the
present Scheme.
33. Another aspect is the objections filed by Vigneshwara Victims
Welfare Association. The said Association has about 300 allottees. Most of
these allottees have entered into a settlement with the promoters of the
respondent company before the Delhi High Court Mediation and
Conciliation Centre. Now, having entered into a settlement, at this stage, in
my opinion, the said Association cannot be allowed to resile from their
settlement agreement especially as nothing has changed since signing of the
Settlement Agreement. The members of the Associations cannot be
permitted walk out from the settlements entered into before the Delhi High
Court Mediation and Conciliation Centre without any rhyme or reason.
34. Another objection has been filed by Wellone Wash and Clean Services
Private Limited. It is their case that they are creditors of the company
Vigneshwara Developwell Private Limited. However, they do not find any
place in the Scheme of Settlement. A perusal of the Scheme would show that
it is dealing with the allottees. As noted above, under section 391 of the
Companies Act, allottees can constitute a class of creditors in terms of
Section 391 of the Companies Act. As the said objectors, named, do not find
place in the Scheme it is manifest that the Scheme does not cover the said
objector and the settlement of their dues would take place in the normal
course as per law after revival of the company or through the Official
Liquidator as the situation develops.
CP 885/2015 Page 17
35. Another plea that has been strongly urged by some of the Objectors is
that the respondent company is not Real Estate (Regulation and
Development) Act, 2016 (RERA) compliant. I may note that when these
projects were launched the said statutory provision, namely, RERA was not
in existence. It would now be for the propounders of the Scheme/the various
associations as stated in the Scheme to take steps for making the Scheme
RERA compliant.
36. On the above facts, reference may be had to the judgment of the
Supreme Court in Meghal Homes (P) Ltd. vs. Shree Niwas Girni
K.K.Samiti and Others, (supra) where the court held as follows:-
“45. Considerable arguments were raised on the role of the Court when a scheme under Section 391 of the Act was propounded for its consideration. The decision in Miheer H. Mafatlal v. Mafatlal Industries Ltd. [(1997) 1 SCC 579] was relied on. That was a case of merger or amalgamation of two companies. Neither of the companies was in liquidation. This Court held that compromise or arrangement included amalgamation of one company with another. This Court also defined the broad contours of the jurisdiction of the Company Court in granting sanction to a scheme in terms of Section 391 and Section 393 of the Act. This Court laid down the following parameters:
“1. The sanctioning court has to see to it that all the requisite statutory procedure for supporting such a scheme has been complied with and that the requisite meetings as contemplated by Section 391(1)(a) have been held.
2. That the scheme put up for sanction of the Court is backed up by the requisite majority vote as required by Section 391 sub-section (2).
3. That the meetings concerned of the creditors or members or any class of them had the relevant material to enable the voters to arrive at an informed decision for approving the scheme in question. That the majority CP 885/2015 Page 18 decision of the class of voters concerned is just and fair to the class as a whole so as to legitimately bind even the dissenting members of that class.
4. That all necessary material indicated by Section 393(1)(a) is placed before the voters at the meetings concerned as contemplated by Section 391 sub-section (1).
5. That all the requisite material contemplated by the proviso of sub-section (2) of Section 391 of the Act is placed before the Court by the applicant concerned seeking sanction for such a scheme and the Court gets satisfied about the same.
6. That the proposed scheme of compromise and arrangement is not found to be violative of any provision of law and is not contrary to public policy. For ascertaining the real purpose underlying the scheme with a view to be satisfied on this aspect, the Court, if necessary, can pierce the veil of apparent corporate purpose underlying the scheme and can judiciously x-ray the same.
7. That the Company Court has also to satisfy itself that members or class of members or creditors or class of creditors, as the case may be, were acting bona fide and in good faith and were not coercing the minority in order to promote any interest adverse to that of the latter comprising the same class whom they purported to represent.
8. That the scheme as a whole is also found to be just, fair and reasonable from the point of view of prudent men of business taking a commercial decision beneficial to the class represented by them for whom the scheme is meant.
9. Once the aforesaid broad parameters about the requirements of a scheme for getting sanction of the Court are found to have been met, the Court will have no further jurisdiction to sit in appeal over the commercial wisdom of the majority of the class of persons who with their open eyes have given their approval to the scheme even if in the view of the Court there would be a better CP 885/2015 Page 19 scheme for the company and its members or creditors for whom the scheme is framed. The Court cannot refuse to sanction such a scheme on that ground as it would otherwise amount to the Court exercising appellate jurisdiction over the scheme rather than its supervisory jurisdiction.”

46. We may straightaway notice that this Court did not have occasion to consider whether any additional tests have to be satisfied when the company concerned is in liquidation and a compromise or arrangement in respect of it is proposed. Therefore, it cannot be said that this would be the final word on any scheme put forward under Section 391 of the Act, whatever be the position of the company concerned. Even then, this decision lays down the need to conform to the statutory formalities, the power of the Court to ascertain the real purpose underlying the scheme, the bona fides of the scheme, the good faith in propounding it and that as a whole, it is just, fair and reasonable, at the same time emphasising that it is not for the court to examine the scheme as if it were an appellate authority over the commercial wisdom of the majority.

47. When a company is ordered to be wound up, the assets of it are put in possession of the Official Liquidator. The assets become custodia legis. The follow-up, in the absence of a revival of the company, is the realisation of the assets of the company by the Official Liquidator and distribution of the proceeds to the creditors, workers and contributories of the company ultimately resulting in the death of the company by an order under Section 481 of the Act, being passed. But, nothing stands in the way of the Company Court, before the ultimate step is taken or before the assets are disposed of, to accept a scheme or proposal for revival of the Company. In that context, the court has necessarily to see whether the scheme contemplates revival of the business of the company, makes provisions for paying off creditors or for satisfying their claims as agreed to by them and for meeting the liability of the workers in terms of Section 529 and Section 529- A of the Act. Of course, the court has to see to the bona fides of CP 885/2015 Page 20 the scheme and to ensure that what is put forward is not a ruse to dispose of the assets of the company in liquidation.

37. Similarly, in Modiluft Limited vs. S.K.Modi, 2005 (123) DLT 413, a
co-ordinate Bench of this court held as follows:-
“40. I do not find that the scheme is inherently incapable of performance and unworkable. I would take note of some of the case law cited at the Bar, which would throw light on the approach to be adopted in such cases.

41. Dealing with such aspects, the Gujarat High Court (speaking through D.A. Desai, J. as His Lordship then was) and considering the matter in all its length and breadth in re. Maneckchowk and Ahmedabad Manufacturing Co. Ltd. reported (1970) 40 Comp. Cas. 819 made the following observations which would equally apply to the present fact situation:
“Even at the cost of repetition, it must be mentioned that the scheme is opposed by a very few creditors and an infinitesimally small number of shareholders. The fact that the scheme has been approved by a requisite majority of shareholders is undoubtedly a strong argument in its favour, unless it is shown that their approval was not obtained fairly and the terms of the scheme are not such as a reasonable man may accept. The approval of a scheme by statutory majority of creditors and members is not decisive of the matter. But it is equally true that due weight should be attached to the choice indicated by the creditors and members who are vitally interested in the company and the scheme affecting the company. Further, on the analysis of the votes cast at the meeting, the salient feature that comes out to the surface is that the scheme was opposed especially by those who, apart from the merits of the scheme, are personally opposed to Gopaldas Parikh and Linubhai Banker. The feud appears to be more between the blood relations rather than between the creditors and members who have offered their best commercial judgment to the scheme on its merits. It is an inescapable CP 885/2015 Page 21 conclusion that Chandulal Banker as a power of attorney holder of Shardaben, and Shantaben who is the principal contender, opposed the scheme tooth and nail not because he had the interest either of the company or creditors and members at heart but because he had to leave the active management when Gopaldas Parikh and Linubhai Banker stepped in and because of his personal vandetta against both of them. In this view of the matter it is not possible to accept the submission of Mr. Vakil that the scheme should not be imposed upon dissentient members.”

43. It is also trite law that the Court would not reject a scheme simply because there could have been a better scheme. In re. Sussex Brick Co. Ltd., 1960 (1) ALL E.R. 773, the Court brushed aside this type of criticism of the scheme in the following manner:
“The applicant set out certain criticisms in his affidavit which undoubtedly show that a good case could be made out for the formulation of a better scheme, of a fairer scheme of a scheme which would have been more attractive to the shareholders, if they could have understood the implications of the criticisms. I have no doubt at all that a better scheme might have been evolved; but is that enough? Is it necessary to establish the validity of such an offer as put forward in the present case? A better and fairer offer might have been made, but the fact that the offer that was made is not one hundred per cent, fair or right is not the kind of unfairness with which MAUGHAM, J., was dealing in re. Hoare & Co., Ltd, I think that the scheme must be obviously unfair, patently unfair, unfair to the meanest intelligence. I do not think that merely finding items in the scheme or details of the scheme which are open to valid criticism is enough. A scheme can be effective to bind a dissenting shareholder without complying to the extent of one hundred per cent, with the highest possible standards of fairness, equity and reason. After all, a man may have an offer made to him and, CP 885/2015 Page 22 although he likes something better, may be prepared to accept it, because it is good enough in all the circumstances. It may well be that the grounds for criticizing the present scheme are not grounds of such a nature as to render the whole thing unfair in the sense intended by MAUGHAM, J., in re. Hoare & Co. Ltd.Where the statutory majority has accepted the offer the onus must rest on the applicant to satisfy the Court that the price offered is unfair. I have some information about the present share values. I have no information about what the present value of Sussex Brick Co. Ltd.’s shares is because they are no longer quoted, but there is no doubt that three shares in that company which were worth at the relevant dates something like 21s. 3d. have now been transposed into two shares in Redland Holdings Ltd., which are worth 43s. 1d. today on the Stock Exchange quotation. It is a rather curious result that a man who parts under compulsion with property, which all agree was worth something in the neighbourhood of 22s. should both now find himself in possession of property which, according to Stock Exchange quotations, is worth nearly twice that amount i.e. 43s. and should say that the exchange is unfair. It is a little hard to see that he has driven such a a bad bargain. True, the scheme offers specific grounds for criticism, but in this connexion, „unfairness‟ means patent unfairness, obvious unfairness, convincing unfairness, and that has not been established in the present case.
I am not satisfied that this scheme is unfair in the sense in which MAUGHAM, J., used that word in re. Hoare & Co. Ltd. and I decide that the application ought not to succeed.”

38. Keeping in view the facts of this case, in my opinion, the Scheme as a
whole is just, fair and reasonable. There is no violation of any statutory
provisions. It is in the interest of justice that the Scheme is approved subject CP 885/2015 Page 23 to supervision of this court through a retired Judge of this Court.
39. The Scheme is accordingly approved subject to the following:-
(i) Mr.Justice Vinod Goel (Retd.) (Mobile No.9910384637) is appointed
as the Court Appointed Supervisor to supervise implementation of the
Scheme/ The Propounders would be entitled to implement the Scheme, as
above, under supervision of the Court Appointed Supervisor.
(ii) The Court Appointed Supervisor will ensure that the initial task as
stipulated in the Scheme are completed expeditiously in a time bound
manner. The OL will permit the promoters to implement the Scheme, as
stated above, under the supervision of the Court Appointed Supervisor.
(iii) The propounders of the Scheme will be permitted to open a separate
escrow account where all revenues received pursuant to the revival scheme
would be deposited. The escrow account would be operated under the
supervision of the court appointed supervisor.
(iv) The Court Appointed Supervisor is empowered to pass any directions
or orders to the promoters for the purpose of implementing of the Scheme.
(v) The functioning of the Scheme shall be reviewed by the Company
Court after three months. If necessary, this court would be at liberty to pass
further directions as the developments may require.
(vi) The fees of the Court Appointed Supervisor is fixed at Rs.1,00,000/-
plus out of pocket expenses per month. This will be subject to enchancement
thereafter, if required.
(vii) I have noticed that the Scheme in para 85 states that the statutory
authorities including ROC, Income Tax Department, Service Tax
Department and Value Added Tax Department would be directed not to
initiate proceedings in respect of non-compliance on the part of the CP 885/2015 Page 24 companies, the promoters, Directors, Shareholders for a period of six
months. The statutory authorities including DTCP, HSIIDC and Income Tax
Departments were also to waive off interest/penalties charged/levied for non-
compliance under applicable laws. I may only clarify that the Scheme is
approved subject to a direction to the said departments may take a lenient
view while dealing with the company keeping in view the attempts to revive
the company.
40. With the above directions, application stands disposed of. JAYANT NATH, J
JANUARY 27, 2020/n CP 885/2015 Page 25