Bombay High Court
Samir Narain Bhojwani vs Bombay Slum Redevelopment … on 10 February, 2020
jdk 1 IA-19-comapl-491-19.doc Digitally IN THE HIGH COURT OF JUDICATURE AT BOMBAY signed by Jayant D.Jayant D. Kandarkar ORDINARY ORIGINAL CIVIL JURISDICTIONKandarkar Date: 2020.02.10 INTERIM APPLICATION NO. 1 OF 2019 12:25:11 +0530 IN COMM. APPEAL (L) NO. 491 OF 2019 IN COMM. ARBITRATION PETITION NO. 527 OF 2019 SAMIR NARAIN BHOJWANI ] of Mumbai, Indian Inhabitant carrying ] on business inter alia from his office at ] 1st Floor, Samir Complex, Opp. Holy ] Family Hospital St. Andrews Road, ] Bandra (West) Mumbai-400 050 ].. Applicant/ Ori. Appellant IN THE MATTER BETWEEN: SAMIR NARAIN BHOJWANI ] of Mumbai, Indian Inhabitant carrying ] on business inter alia from his office at ] 1st Floor, Samir Complex, Opp. Holy ] Family Hospital St. Andrews Road, ] Bandra (West) Mumbai-400 050 ].. Appellant/ Ori. Respondent Vs. BOMBAY SLUM REDEVELOPMENT ] CORPORATION LTD. a Company ] registered under Companies Act, 1956 ] and having its registered office at 605, ] Trade Centre, Bandra-Kurla Complex ] Bandra (E) Mumbai-400051 ].. Respondent/ Ori. Petitioner jdk 2 IA-19-comapl-491-19.doc ….Mr. Aspi Chinoy, Senior Counsel with Mr. Parimal K. Shroff, Mr.D.V. Deokar, Mr. Sachin Pandey and Mr. D. Parekh and Ms. SiddhiParadkar i/b Parimal K. Shroff & Co. for Applicant /AppellantMr. Mahendra Ghelani a/w Mr. Atman Mehta, Mr. Anand Pai, Ms.Vaishali Shah, Ms. Afrin Dalal, Mr. Nishit Patel, Ms. Ruma Rajdevand Ms. Aditi Hambarde i/b M/s. Law Charter for the Respondent. …. CORAM: PRADEEP NANDRAJOG, C.J. & SMT. BHARATI DANGRE, J.
RESERVED ON : FEBRUARY 06, 2020 PRONOUNCED ON : FEBRUARY 10, 2020ORDER[ PER PRADEEP NANDRAJOG, CJ.] :
1. The Appeal was admitted on 9th December 2019. By thisorder we are deciding Interim Application No.1 of 2019. We aredeciding whether prayer clause (c) needs to be granted. The saidprayer reads as under: “(c) That pending the hearing and final disposal of the Appeal the Court Receiver, High Court, Bombay or some other fit and proper person be appointed as Receiver of the immovable properties more particularly set out in Exh.’J’ hereto with all powers under Order XL Rule 1 of the Civil Procedure Code, 1908.” jdk 3 IA-19-comapl-491-19.doc2. At the outset it may recorded that the Award infavour of the appellant holding that the respondent was inbreach of the Agreement between the parties and awarding₹ 209 crores to the appellant and a further sum of ₹ 53 crores 209 crores to the appellant and a further sum of ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 53 croresas a consequence of the respondent selling 15 flats in the ‘A’wing of the building which had been earmarked under an orderpassed under Section 17 of the Arbitration and ConciliationAct, 1996.
3. Section 9 of the Arbitration and Conciliation Act1996 reads as under:- “9. Interim measures, etc. by Court.– A party may, before or during arbitral proceedings or at any time after the making of the arbitral award but before it is enforced in accordance with section 36, apply to a court– (i) for the appointment of a guardian for a minor or a person of unsound mind for the purposes of arbitral proceedings; or (ii) for an interim measure of protection in respect of the following matters, namely:–
(a) the preservation, interim custody or sale of any jdk 4 IA-19-comapl-491-19.doc goods which are the subject-matter of the arbitration agreement;
(b) securing the amount in dispute in the arbitration;
(c) the detention, preservation or inspection of any property or thing which is the subject-matter of the dispute in arbitration, or as to which any question may arise therein and authorising for any of the aforesaid purposes any person to enter upon any land or building in the possession of any party, or authorising any samples to be taken or any observation to be made, or experiment to be tried, which may be necessary or expedient for the purpose of obtaining full information or evidence;
(d) interim injunction or the appointment of a receiver;
(e) such other interim measure of protection as may appear to the court to be just and convenient, and the Court shall have the same power for making orders as it has for the purpose of, and in relation to, any proceedings before it.”
4. The preliminary objection to the maintainability ofthe application is that said Section is the only statutoryprovision which empowers a Court in arbitration proceedingsto pass an interim orders and that an interim order can bepassed after an Award is pronounced to secure the benefit under jdk 5 IA-19-comapl-491-19.docthe Award to the winning party; and since on being set asidethere is no Award in favour of the appellant the question of anyinterim measure does not arise.
5. The answer to the maintainability of the appeal issimple. The issue pertaining to the validity of the Award is ressub-judicata till the appeal is decided and thus the AppellateCourt would have the power to pass such interim orders whichmay be necessary keeping in view the Award, notwithstandingthe same having been set aside by the learned Single Judge.
6. On merits, the relevant facts are that one Mr. Aurorahad the development rights to redevelop the land which is thesubject-matter of the Agreement between the parties enteredinto on 10th March 2003. He assigned his rights to therespondent and as per which Agreement of Assignment therespondent had to redevelop the property and give 8 flats tosaid Mr. Aurora. The Agreement dated 10th March 2003envisaged that the respondent would construct the flats forrehabilitating the existing occupants on the land + 40 PAP jdk 6 IA-19-comapl-491-19.doctenements and the F.S.I. available for free-sale componentwould be utilised by the appellant to construct flats to be sold inthe market with share of the appellant and the respondent inthe free-sale component being in the ratio of 55% : 45%. Therespondent was to obtain all necessary permissions to facilitateconstruction of the free-sale buildings.
7. Under the Development Plan a 9.15 meter wide roadhad to be laid after the encroachers were removed and the landon which the road had to be laid had to be made available to theCorporation free of costs with a benefit of an additional F.S.I.pertaining to the said land being available on the remainingland. There is a dispute between the parties whether 21,386square meters free-sale component envisaged by the Agreementdated 10th March 2003 included the benefit of the area coveredby the road or whether it would be available after theencroachments were removed, but this would be irrelevant forpurpose of deciding the interim measures sought by theappellant.
jdk 7 IA-19-comapl-491-19.doc
8. To secure the free-sale area available the respondentaltered the existing SRD Scheme to a SRA Scheme and clubbedthe same with another SRA Scheme undertaken by therespondent at Kandivali. As a result the number of PAPtenements required to be constructed increased from 40 to 107,but as a result of clubbing the same were to be constructed bythe respondent at Shiv Shakti Nagar Kandivali. The free-salearea of 2553 square meters from these PAPs was transferredfrom Shiv Shakti Nagar to Andheri i.e. the land which formedthe subject-matter of the Agreement dated 10th March 2003.Meaning thereby, the construction of the PAP tenements by therespondent at Shiv Shakti Nagar Kandivali became intrinsicallylinked to the utilisation of the free-sale area for the buildings tobe constructed as per the Agreement dated 10th March 2003.
9. On said basis, on 21st October 2010 the SRA issuedIOA/Sanction Building Plans for 3 wings at Andheri referred toas Wings ‘A’, ‘B’ & ‘C’. Each wing having 22 floors with a free-sale area of 21,135 square meters. Wings ‘A’ and ‘B’ had free-sale constructible area of 15,425 square meters and Wing ‘C”of 5710 square meters.
jdk 8 IA-19-comapl-491-19.doc
10. 44 flats were sanctioned to be constructed in Wing’A’ and 44 in Wing ‘B’. In the ratio of 55 : 45 the appellantwas entitled to 48.33 flats and the respondent was entitled to39.63 flats, 20 of which were in Wing ‘A’ and 19.63 in Wing’B’. As per the appellant the free-sale area of 21,386 squaremeters excluded the benefit of additional F.S.I. relatable to theland on which the 19.15 meters road had to be laid and that on7th March 2012 the respondent obtained a Letter of Intentincreasing the free-sale area of 2856 square meters butconditionally upon the respondent handing over to theCorporation the land on which the road had to be laid byremoving the encroachments and thus the requested theappellant to load additional F.S.I. by adding floors in Wing ‘C’beyond the existing 22 floors. The appellant refused to do sogiving two reasons, firstly; that the additional F.S.I. wasconditional on handing over possession of land to theCorporation to lay the road which condition the respondent wasunable to fulfill and secondly; Wing ‘C’ had been designed onlyfor 22 floors i.e. the structural drawings prepared as also thereinforcement drawings for the building to bear the load was jdk 9 IA-19-comapl-491-19.docwith reference to the building having 22 floors. By then, thebuilding comprising Wing ‘C’ had reached the 5 th floor level.The respondent did not apply for commencement certificate tofacilitate construction of Wing ‘C’ beyond the 5 th floor and as aresult the appellant refused to hand over possession of 39 flatsto the respondent in Wing ‘A’ & Wing ‘B’.
11. In January 2016 the appellant invoked thearbitration clause and during the pendency of the arbitrationproceedings the respondent filed an Application under Section17 of the Arbitration and Conciliation Act praying thatpossession of 39 flats in Wings ‘A’ & ‘B” which wereconstructed be directed to be handed over to it because itneeded funds after selling said flats to construct the PAPs.
12. On 20th October 2016 the learned Arbitratordirected the appellant to hand over possession of 16 flats inWing ‘B’ to the respondent requiring 15 flats in Wing ‘A’ to theshare of the respondent to be kept aside and being available incase the appellant succeeded in the arbitration proceedings.
jdk 10 IA-19-comapl-491-19.doc
13. Needless to state 8 flats in the said two Wings whichwere to the account of the respondent were earmarked to begiven to said Mr. Aurora.
14. The appellant’s challenge to the said decision of thelearned Arbitrator was negated by this Court but with apertinent observation that the appellant had in effect beengranted an attachment before judgment of the 15 flats in Wing’A’ which were otherwise earmarked for the respondent.
15. The appellant handed over possession of 16 flats inWing ‘B’ to the respondent. The respondent could notconstruct a single additional PAP.
16. On 7th September 2018 the learned Arbitratorpublished the Award holding that the respondent breached itsobligations, firstly; by refusing to apply for commencementcertificate which was necessary to construct above the 5 th floorlevel in Wing ‘C’ and secondly; by not constructing the 107 jdk 11 IA-19-comapl-491-19.docPAP tenements at Kandivali which was a precondition for grantof occupation certificate for Wing ‘C’. The learned arbitratoralso held that the respondent was not entitled to insist onloading the additional F.S.I. on 2856 square meters underLetter of Inter No.4 of 2012 on Wing ‘C’ because the same wasgranted conditionally upon the respondent removingencroachments on the land on which the 9.15 meters wide roadhad to be laid by the Corporation inspite of 6 years havinglapsed when Letter of Intent No.4 was obtained by therespondent on 7th March 2012 till when the Award waspublished. Lastly, the learned Arbitrator has reasoned that thestructure of Wing ‘C’ had been designed only for a load of 22floors. In view of the afore-noted breaches and reason theAward held that the respondent was not entitled to possessionof 45% built up area in Wings ‘A’ & ‘B’. The respondent hasbeen directed to perform its obligation under the contract byconstructing 107 PAPs and by obtaining commencementcertificate for floors 6 to 22 on Wing ‘C’ and in lieu of specificperformance the appellant has been held entitled tocompensation in sum of ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 209 crores.
jdk 12 IA-19-comapl-491-19.doc
17. Pertaining to the 20 flats in Wing ‘A’ assigned to therespondent under the Agreement between the parties, 5 flatsbeing A1 & A2 on the first floor, A1 and A2 on the 4 th floor andA1 on the 7th floor have been earmarked for Mr. Aurora and theremaining 15 flats being A2 on the 7th floor, A1 & A2 on the 8th,9th, 12th, 15th, 16th, 17th and 22nd floor assigned to therespondent they came to be further assigned by the respondentadmittedly to the family members of its directors on variousdates between 5th November 2016 to 11th November 2016 withsale amounts ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 3.98 crores to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 4.45 croresbut actual amounts received from the said family members andfriends ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 50,000/- to a maximum of ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 3 lacs.Pertaining to 19 flats in Wing ‘B’ and 67% share of therespondent in 1 flat in Wing ‘B’, a flat on the 1 st floor and 2 flatson the 4th floor have been earmarked for Mr. Aurora to satisfyhis claim of 8 flats in the entire complex and as regards theremaining 16 flats they have been sold to friends and relatives ofthe directors of the respondent on various dates between 5 thNovember 2016 and 16th November 2016 with saleconsideration varying between 3.92 crores to 4.4 crores but theamounts received ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 50,000/- to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 2,00,000/-.
jdk 13 IA-19-comapl-491-19.doc
18. On various dates between 8th February 2017 till 23rdOctober 2019 said friends and relatives of the Directors of therespondent have further sold the flats to third parties foramounts ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 5.10 Crores to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 7.5 Crores andhave received sale consideration between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 5 lakhs to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 7.5Crores. To put in tabulated form, the position of the flats inWing ‘A’ & Wing ‘B’ would be as under:-
WING A BAYVIEW BUILDING No. Floor Flat No. Party Name Date of Agreemen Amount Agreement t Amount paid in in Lakhs Lakhs 1 1 A-1 Aurora 2 1 A-2 Aurora 3 4 A-1 Aurora 4 4 A-2 Aurora 5 7 A-1 Aurora 6 7 A-2 Harsukhlal 11/11/16 406 3 Hemani 7 8 A-1 Harsukhlal 11/11/16 398 3 Hemani 8 8 A-2 Harsukhlal 11/11/16 406 3 Hemani 9 9 A-1 Aditi Hemani 07/11/16 398 1 10 9 A-2 Aditi Hemani 07/11/16 406 1 11 12 A-1 Manchaben 05/11/16 417 1.25 Hemani jdk 14 IA-19-comapl-491-19.doc 12 12 A-2 Manchaben 05/11/16 426 1.25 Hemani 13 15 A-1 Manchaben 05/11/16 417 1.25 Hemani 14 15 A-2 Manchaben 05/11/16 426 1.25 Hemani 15 16 A-1 Kiran Hemani 05/11/16 417 1.35 16 16 A-2 Kiran Hemani 05/11/16 426 1.35 17 17 A-1 Kiran Hemani 05/11/16 417 0.50 18 17 A-2 Kiran Hemani 05/11/16 426 0.50 19 22 A-1 Meena Hemani 05/11/16 436 1.75 20 22 A-2 Meena Hemani 05/11/16 445 1.75 List of flats sold in Bay View – B WingSr. Wing Floor Flat Party Date of Amt Amt Amt AmtNo. No. Name Agree in in in in ment lacs lacs lacs lacs1 B B3 67% BSRCL & 1 33% SNB2 B B4 Aurora3 B B3 Aurora4 B 4 B4 Aurora5 B B3 Priyank 05/11/16 402 0.5 Karan V 08/02/17 515 5.15 7 Hemani Singh6 B B-4 Priyank 05/11/16 392 0.5 Karishma 08/02/17 510 5.10 Hemani V Mangal7 B B3 Yogesh N 05/11/16 402 1 Siddivinay 07/09/19 603 5 Verma ak Realotrs LLP8 B 8 B4 Aditi 05/11/16 392 1 Siddhivina 07/09/19 603 5 Priyank yak Hemani jdk 15 IA-19-comapl-491-19.doc9 B B3 Meena K 16.11.16 402 1.5 Siddivinay 29.12.18 558 558 9 Hemani ak10 B B4 Meena K 11/11/16 392 1.5 Rajkimar 08/02/17 510 510 Hemani Singh11 B B3 Manju Y 05/11/16 421 1 Siddhivina 07/09/19 603 5 12 Verma yak12 B B4 Pratish H 05/11/16 411 2 Siddivinay 07/09/19 603 5 Bilakhia ak13 B B3 Kiran 05/11/16 421 0.5 Dr.Niranja 08/05/18 750 750 Hemani n Banka14 B 15 B4 Kiran 05/11/16 411 0.5 Dr. 08/05/18 750 750 Hemani Niranjan Banka15 B B3 Harasukhla 05/11/16 421 2.5 Siddivinay 29.12.18 603 603 lA ak 16 Hemani HUF16 B B4 Harsukhlal 05/11/16 411 2.5 Siddivinay 29.12.18 603 603 al A ak Hemani HUF17 B B3 Priyank 05/11/16 421 0.5 Potential 03/05/18 750 750 Hemani Builders18 B 17 B4 Priyank 05/11/16 411 0.5 Potential 03/05/18 750 750 Hemani Builders19 B B3 Priyank 05/11/16 440 0.5 Siddhivina 19.9.19 603 603 Hemani to yak20 B 22 B4 Priyank 05/11/16 429 0.5 Siddhivina 23.10.19 603 5 Hemani yak jdk 16 IA-19-comapl-491-19.doc
19. From the above information tabulated herein aboveit is apparent that the respondent is resorting to a strategy ofcontrivance by creating smokescreen to ensure that the flatsfalling to its share under Agreement are not available should theappeal succeed and the Award restored. It does not stand tologic and reason that the respondent which obtained a valuableorder from the Arbitrator under Section 17 of the Arbitrationand Conciliation Act on the plea that it needed the flats for salein the market to generate funds and use the same to construct107 PAP tenements would receive between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 50,000/- to amaximum of ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 3 lakhs in November 2016 from the friends andrelatives of the Directors of the respondent and make noattempt to receive balance sale consideration ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores3.97 crores to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 4.43 crores. Similarly, pertaining to the flats at’B’ Wing the panic sales after the Award was set aside by thelearned Single Judge is sufficient indication to the Court that ameasure on the analogues principles of Order XXXVIII Rule 5of the Civil Procedure Code should be granted in exercise of thepower under Section 9 of the Arbitration and Conciliation Actand more so for the reason in the affidavit-in-reply filed to theinstant application the respondent has admitted having sold its jdk 17 IA-19-comapl-491-19.docoffice. Meaning thereby, if the Award is restored the appellantwould be left with no remedy to enforce the Award.
20. We note at this stage that since the Award had notbeen stayed pending a challenge to the Award under Section 34of the Arbitration and Conciliation Act by the respondent aReceiver was appointed on 9th September 2019 of the 26 flats:15 in Wing ‘A’ and 15 in Wing ‘B’ and an injunction wasgranted to restrain the respondent from alienating,encumbering, disposing of or creating third party rights inrespect of the development potential of Wing ‘C’.
21. In view of the fact that except for flats B3 and B4 onthe 8th floor of ‘B’ Wing and flat Nos. B3 & B4 o the 12 th floorand flat No.B4 on the 20th Floor of the ‘B’ Wing building, thefriends and relatives of the Directors of the respondent havereceived full payment from third parties we exclude the saidflats from the rigors of any interim measure and direct that theReceiver appointed in the execution proceedings would bedeemed to be the Receiver appointed under this Order inrespect of the 15 flats in Wing ‘A’ falling to the share of the jdk 18 IA-19-comapl-491-19.docrespondent (excluding the 5 flats falling to the share of Mr.Aurora as also for flat No. B3 & B4 on the 8 th floor, flat Nos. B3& B4 on the 12th floor, and flat No.B4 on the 22nd floor of the’B’ Wing building).
22. On the argument of the respondent that the Courtcannot pass any order which affects the right of third parties,suffice it to highlight that if the Court finds that assignment tothird parties are a smokescreen it would mean that theassignments are not assignments in the eyes of law; the so calledassignments are papers tigers created on paper to frustrate theclaim of the appellant should the Award be restored. Thebeneficial ownership transfers if sale consideration is received.To put it differently, the third parties can always approach thisCourt praying that the Receiver be directed to hand over thebalance sale consideration from them and hand over possessionof the said flats. It cannot be overlooked that for flats havingsale value shown in the documents executed by the respondentand further documents by the friends and relatives of theDirectors of the respondent meager amounts ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores50,000/- to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 5 crores have been received with sale jdk 19 IA-19-comapl-491-19.docconsideration of the flats shown to be ranging between ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 3.98crores to ₹ 209 crores to the appellant and a further sum of ₹ 53 crores 6.03 crores.
23. The Interim Application is disposed of by directingthat the Receiver appointed in the execution proceedings takenby the appellant to enforce the Award shall be the Receiverappointed under this order for 15 flats in Wing ‘A’ and flat Nos.B3, B4, B3, B4 and B4 on the 7 th, 8th floor, 12th and 20th floorsrespectively of the building in Wing ‘B’. The respondent isrestrained from creating any third party interest in the flatsconstructed and proposed to be constructed in Wing ‘C’ till thedisposal of the appeal.
24. In view of the fact that we have granted the appellantan interim measure as above, hearing of the appeal is expedited.The appeal shall be listed for direction in the admission boardon 2nd March 2020.
SMT. BHARATI DANGRE, J. CHIEF JUSTICE