Bombay High Court
Subodh M Joshi vs Municipal Corporation Of Greater … on 17 August, 2022
Bench: G.S. Patel, Gauri Godse
8-OSWPL-21683-2022.DOC Ashwini IN THE HIGH COURT OF JUDICATURE AT BOMBAY ORDINARY ORIGINAL CIVIL JURISDICTION WRIT PETITION (L) NO. 21683 OF 2022 Subodh M Joshi …Petitioner Versus Municipal Corporation of Greater Mumbai & Ors …Respondents Mr AM Saraogi, with Sahil Ansari, for the Petitioner. Mr Bipin Joshi, for the Respondent. Mr Sukanta Karmakar, AGP, for the State. Mr Sagar Patil, for the MCGM, is present. Mr Suyash Balip, SEBP ‘N’ Ward, with Bhakti Mane, QSEWW ‘N’ Ward, are present. Mr SK Dhekale, Court Receiver, is present. CORAM G.S. Patel & Gauri Godse, JJ.
DATED: 17th August 2022 PC:-ASHWINIHULGOJIGAJAKOSHDigitally signed byASHWINI HULGOJI
1. It is entirely possible that the state of affairs reflected in thisGAJAKOSHDate: 2022.08.1811:23:36 +0530 Writ Petition is symptomatic of all development and redevelopment in this city.
2. The project in question is something called Integrated ‘Arya’ at village Kirol, Narayan Nagar, Ghatkopar West, Mumbai 400 086. The Petitioner is concerned with one flat. We are told that this is flat C-501, i.e., flat No. 501 on the fifth floor of Wing ‘C’. This is not a Page 1 of 15 17th August 2022 8-OSWPL-21683-2022.DOCfree sale building but is a rehab building to which the Petitioner isentitled. That is undisputed. It is also undisputed that the Petitioneris presently in transit accommodation being paid for and provided bythe 3rd Respondent, Integrated Spaces Limited.
3. The building owner/developer claims that five of the sixbuildings in this project, including Wing ‘C’, with which we areconcerned, are ‘complete’ and ‘ready for occupation’. We are toldthat 30 persons are already in occupation and have taken up theirrespective tenements.
4. The reality is entirely different. Annexed to the Petition frompage 317 at Exhibit “L” are photographs said to be of 31st May2022. We see unfinished flooring, exposed wiring, lifts that are in nosense ready, raw concrete slabs, staircases without hand rails, water-logging and more. Particularly astonishing are the photographs atpages 317, 319, 320, 321, 322, 325, 327, 328 and 329. This building isin no sense ready for occupation — at least not by human beings.
5. There is another set of photographs tendered by Mr Joshi forthe 3rd Respondent. It shows a completed façade. But thesephotographs have no date. It is impossible to identify which of thesix buildings we are being shown. We say this because from this verycompilation when we pointed out that the photographs at pages 9,10, 14, 15 and 16 did not show any sign of readiness, we were toldthat these are photographs of some other building. When a flatoccupant comes to court and says that despite promises his flat hasnot been made available on time, there is little point in showing us Page 2 of 15 17th August 2022 8-OSWPL-21683-2022.DOCphotographs of stack parking in the basement, a matter presently ofmonumental irrelevance.
6. On 12th August 2022 we passed the following order: “1. Mr Joshi on behalf of Respondent No. 3 states that the redeveloped building called ‘Integrated Arya’ is ready in all respects. There is a residential accommodation to which the Petitioner is entitled and of which he is at liberty to take possession. Mr Joshi contends that the building is ready in all respects and has an Occupation Certificate. 2. The Petitioner is at present in transit accommodation. This has been provided by Mr Joshi’s client. 3. We permit Mr Saraogi’s client, the Petitioner, to take possession of his allotted Unit No. C-501 in the redeveloped building on a without prejudice and no-equities basis. We are not expecting him on the eve of a four-day weekend to vacate his present transit accommodation. Mr Saraogi states that the redeveloped unit does not have municipal water supply. Mr Joshi maintains that all facilities including a lift etc have been provided. 4. We require Mr Sagar Patil for the MCGM to confirm whether there is a functioning water supply and whether a full or part Occupation Certificate has been issued. An Occupation Certificate is annexed to the Petition at page 330. The reason we are asking Mr Saraogi to check is that it is prima facie difficult to conceive of a situation where an Occupation Certificate has been issued without municipal water supply. 5. Mr Patil’s instructions are to say that on 19th May 2022 certain requisitions have been issued by the MCGM to the 3rd Respondent developer. So far there is non- compliance. We will require particulars on the next date. At Page 3 of 15 17th August 2022 8-OSWPL-21683-2022.DOC this stage, we do not require MCGM to formally file an Affidavit. We will consider that on the next date if required. 6. It goes without saying that once we are satisfied that the redeveloped premises are ready in all respects, Mr Saraogi’s client will have to vacate the transit accommodation currently occupied by him. In no circumstances will Mr Saraogi’s client be entitled to occupy both the transit accommodation and the final permanent accommodation. We do not require an undertaking from the Petitioner for this purpose. We are confident that we will be able to ensure it. 7. List the matter high on board on Wednesday, 17th August 2022.”
7. We were told then, as we were told earlier today, that ‘there iswater supply’. On further questioning, we were then informed,almost reluctantly, that there is no municipal potable water supply.What the 3rd Respondent is doing is providing tanker water and,apparently as some gesture of goodwill or generosity, 20-litre Bisleridrinking water jars. That is not our understanding of ‘water supply’to a residential building. This is not what we understand when weare told that ‘everything is in readiness’. The only water connectionthat seems to have been made available is for construction work. Wedo not think that it is possible to accept the argument that residentsmust use construction water supply even for their domestic needs,leave alone drinking water.
8. At this point matters get worse and considerably uglier. MrPatil tell us that there is something called a Part OccupancyCertificate. By ‘part’ he means that it is given for five of the six Page 4 of 15 17th August 2022 8-OSWPL-21683-2022.DOCbuildings in the project and for up to the sixth floor in the sixthbuilding, Wing F. There is an officer of the building proposalsdepartment to instruct Mr Patil. We have been shown a copy of thePart Occupancy Certificate dated 19th May 2022. A copy is atExhibit ‘M’ to the Petition at page 330. It is surprising that this PartOccupancy Certificate is apparently issued upon a completioncertificate submitted by 3rd Respondent’s architect and, as we havefound out, on very little else. The reason for this will becomeevident shortly. The Part Occupancy Certificate then says that ‘alltemporary provisions in regard to building services are to bemaintained till full Occupancy Certificate’. From this, we aresupposed to understand that the builder must make arrangementsfor even essential services such as water supply. The officer from thebuilding proposal department says that he has inspected thepremises and satisfied himself before the Part Occupancy Certificatewas issued. We have every reason to doubt the correctness of thisinstruction conveyed through Mr Patil.
9. The reason is as follows. On 18th June 2022, the MCGMissued what is called a P form to the 3rd Respondent. It asked forseveral water charges including an amount of Rs. 23,11,121/- forextra charges for construction and Rs. 16,41,694/- for extrasewerage charges. The total amount with other charges Rs.41,78,266/-. The 3rd Respondent has paid no part of this so far. Weare told that the P form has a one year validity. So far there is noresponse at all to the MCGM from the 3rd Respondent. We areasked to believe that this is perfectly all right — even if it means thatthe occupants must go a year without a connected municipaldrinking water supply. Page 5 of 15
17th August 2022 8-OSWPL-21683-2022.DOC
10. Now the MCGM has what is called a trenching policy whereit disallows the digging of any roads during the monsoon period after30th April of each year. This is reasonable. But it also can come asno surprise to anyone, any more than the annual monsoon is asurprise.
11. Before us, the 3rd Respondent tries to make capital of thistrenching policy and says that he cannot provide a drinking waterconnection, because, to do that, the MCGM would have to dig upsome portion of the intervening road and the builder would have todo some RCC work, which needs dry weather.
12. We find this absolutely astonishing. On the one hand thisdeveloper claims to be an accomplished and renowned builder andat the same time is unaware — and expects us to believe that he isunaware — that arrangements would have had to be made for layingan underground water connection to connect to the municipal mainsfor drinking water supply. He expects us to believe that it isacceptable that residents should manage without a proper watersupply and must wait until the MCGM finishes work across theroad. The builder knew the location of the site, the alignment of theroad and where the municipal main ran. None of this was a surpriseeither. We do not know why arrangements have not been made in allthis time to have a connection to the Municipal main in readiness.All that needed to be done was to apply in good time to have the lineto the site readied, leaving only the final connection to be made. Page 6 of 15
17th August 2022 8-OSWPL-21683-2022.DOC
13. In the meantime, those who have taken up occupation aresupposed to be beholden to the 3rd Respondent for receiving tankerwater supply, always a doubtful proposition since tanker watersupply, unless it is of the highest quality, can be extremelyunhealthy, and grateful for these handouts of 20 litre Bisleri bottles.
14. This is no way to run the public administration of civic affairs.We have no choice but to take notice of these matters and issueappropriate directions. The BMC will bear in mind that we will nowdo this in every single matter until the MCGM evolves a policy thatis designed to protect the interests of the residents and not to merelysubserve the profit motives of builders.
15. What has impelled this petition is that the 3rd Respondent istrying to get the Petitioner to take up his allotted flat C-501 on thepretext that ‘it is ready’, and to force the Petitioner to give up histemporary transit accommodation.
16. Chapter X of The Mumbai Municipal Corporation Act 1888deals with water supply. Leaving aside the definitions, the provisionsregarding providing water supply in Sections 270A to 279 areimportant. Some of these are immediately relevant. Sections 270A,271 and 272 read thus: 270A. Premises not to be occupied without Commissioner’s certificate in respect of adequate water supply No person shall occupy or permit to be occupied, or use or permit to be used, any premises or part thereof constructed or reconstructed after the date of the Page 7 of 15 17th August 2022 8-OSWPL-21683-2022.DOCcoming into force of the Bombay Municipal Corporation(Amendment) Act. 1953, until he has obtained acertificate from the Commissioner to the effect thatthere is provided within or within a reasonable distanceof the premises, a supply of pure water to the personsintending to occupy or use such premises or, where thepremises are situated within any portion of Brihan Mumbaiin which a public notice has been given by theCommissioner under section 141, until he has obtained acertificate from the Commissioner to the effect that asupply of pure water has been provided for the premisesfrom a municipal water work.
271. Application for private water supply from whom tobe received (1) Supply pipes for conveying to any premises aprivate supply of water from a municipal water work shallnot be connected with such water work except on thewritten application or with the written assent of the ownerof the premises, of the person primarily liable for thepayment of property-taxes on the said premises;
Provided that, in respect of any premises,where the owner or person primarily liable for the paymentof property-taxes fails or refuses or make such applicationor to give his assent within a reasonable period, the supplypipes for conveying to such premises such water-supplymay be connected with such water work on the writtenapplication of the occupier or such premises made to theCommissioner, after holding necessary inquiry andpayment of the cost of connecting the supply pipes andsubject to such other conditions (including those forpayment of water taxes and water charges) as theCommissioner may deem fit to impose.
Commissioner may in certain cases require owners toobtain private water supply Page 8 of 15 17th August 2022 8-OSWPL-21683-2022.DOC (2) But it shall appear to the Commissioner that anypremises situated within any portion of Brihan Mumbai inwhich a public notice has been given by the Commissionerunder clause (b) of section 141, are without a supply of purewater, adequate to the requirements of the persons usuallyoccupying or employed upon the said premises, theCommissioner shall, by written notice, require the owner ofthe said premises or the person primarily liable for thepayment of property taxes thereon, to obtain a supplyadequate as aforesaid from a municipal water work and toprovide supply and distributing pipes, cisterns and fittingsand do all such works as may in the opinion of theCommissioner be necessary for that purpose.
272. Making and renewing connection with municipalwater works(1) No connection with any municipal water work shallbe made or renewed– (a) except by a municipal officer or servant empowered in that behalf by the Commissioner; and (b) until the certificate specified in sub-section (4) has been given.
(2) In every case where a new connection with a municipalwater work is made or an existing connection requiresrenewal, all necessary communication pipes and fittingsthereon, shall be supplied by the Commissioner, and thework of laying and applying such communication-pipes andfittings shall be executed by municipal agency under theCommissioner’s order; and the cost of all such materialsand work shall be charged to the-municipal fund.(3) Every such communication-pipe and fittings thereonshall vest in the Corporation and be maintained at thecharge of the municipal fund as a municipal water work.(4) All supply and distributing pipes and cisterns and Page 9 of 15 17th August 2022 8-OSWPL-21683-2022.DOC fittings not being the property of the Corporation shall be laid and applied under the supervision and to the satisfaction of a Municipal Officer appointed by the Commissioner in that behalf, who shall give and sign a certificate, free of charge, when such supply and distributing pipes, cisterns and all necessary fittings have been laid, applied and executed in a satisfactory manner and when proper and sufficient arrangements have been made for draining off waste water.
(5) Where any supply or distributing pipe, cistern or such fitting is laid, applied, added to or altered, or any connection is made in contravention of this section the Commissioner may, with the previous approval of the Standing Committee remove such supply or distributing pipe, cistern, fitting or connection, or additions or alterations thereto, and make good such pipe, cistern, fitting or connection ; and the owner and occupier of the premises in which or for supply to which such supply or distributing pipe, cistern or fitting has been laid, applied, added to or altered or such connection has been made, shall be jointly and severally liable to pay the expenses incurred by the Commissioner in so doing.
(Emphasis added)
17. These provisions must be read with Section 353A regardingcertificates. This section reads as follows: 353A. Completion certificates: permission to occupy or use (1) Every person who employs a licensed surveyor or person approved by the Commissioner to erect a building or execute any such work as is described in section 342, shall, within one month after the completion of the erection of such building or the Page 10 of 15 17th August 2022 8-OSWPL-21683-2022.DOCexecution of such work, deliver or send or cause to bedelivered or sent to the Commissioner at his office,notice in writing of such completion, accompanied by acertificate in the form of Schedule T signed by theperson employed under section 344A, who is herebyrequired immediately upon completion of the work andupon demand by the person employing him to sign and givesuch certificate to such person, and shall give to theCommissioner all necessary facilities for the inspection ofsuch building or of such work;
Provided that– (a) such inspection shall be commenced within seven days from the date of receipt of the notice of completion, and (b) the Commissioner may, within seven days from the date of commencement of such inspection, by written intimation addressed to the person from whom the notice of completion was received, and delivered at his address as stated in such notice, or, in the absence of such address, affixed to a conspicuous part of the building to which such notice relates– (i) give permission for the occupation of such building or for the use of the building or part thereof affected by such work, or (ii) refuse such permission in case such building has been erected or such work executed so as to contravene any provision of this Act or of the bye-laws.(1A) Notwithstanding anything contained in sub-section(1), a co-operative housing society or a federation of co-
operative housing societies registered under theMaharashtra Co-operative Societies Act, 1960 or any Page 11 of 15 17th August 2022 8-OSWPL-21683-2022.DOC condominium or a company incorporated under the Companies Act, 1956 with limited liability or an association of persons any ad hoc body formed by the occupants of the building constructed before the 25th March, 1991 and occupied without obtaining the permission to occupy the building from the Commissioner under section 353A, shall employ a licensed surveyor or person approved by the Commissioner to erect a building or to execute any such work as is described in section 342, who shall after inspecting the said premises deliver or send or cause to be delivered or send to the Commissioner at his office, notice in writing of such completion accompanied by certificate in Form “T”. The certificate given by the licensed surveyor or person approved by the Commissioner to erect a building or execute any such work as is described in section 342, under this sub-section shall, for all purposes, be deemed to be the certificate given under sub-section (1).
(2) No person shall occupy or permit to be occupied any such building, or use or permit to be used the building or part thereof affected by any such work, until
— (a) the permission referred to in proviso (b) to sub-section (1) has been received, or (b) the Commissioner has failed for twenty-one days after receipt of the notice of completion to intimate as aforesaid his refusal of the said permission. (Emphasis added)
18. We fail to understand how an “occupancy” certificate canever be issued to a structure that is totally unfit for humanhabitation. “Occupancy” posits habitability; and an essentialrequirement of any habitable premises is the provision of basic Page 12 of 15 17th August 2022 8-OSWPL-21683-2022.DOCamenities. Water and power are the most basic. It is indeed alarmingthat the MCGM seems to take it for granted that a building withouta regular water supply can be considered habitable and eligible for an’occupancy’ certificate. We refuse to accept any such interpretation.To do so would be to deliver manifest injustice to residents acrossthe city.
19. We intend to pass a direction in future that no OccupationCertificate is to be issued unless the developer can demonstrate thathe has already made preparations by laying the appropriate pipelinesfor connecting to the municipal mains. In high rise buildings all lifts(not construction elevators or construction lifts) must be in fullworking order. It must not be forgotten that when we are talkingabout people moving in, this includes the old and the infirm andyoung children as well. Saying that a building is ready but providinga staircase without a guard or a handrail is to put at risk the lives offuture residents of this building.
20. Therefore, until there is provision made by this builder forlaying the pipelines in preparedness for a water connection, the so-called Part Occupancy Certificate stands suspended. None of thePart Occupancy Certificates issued to the builders for any of thebuildings are to be acted upon for any purpose until connections toMunicipal water mains are demonstrated to us to be ready. Thisrestraint will operate only until the next date.
21. The 3rd Respondent must deposit with the MCGM the fullamount demanded by the MCGM under the P-Form within two Page 13 of 15 17th August 2022 8-OSWPL-21683-2022.DOCweeks from today. For, without P-form compliance, no water supplyconnection can be obtained.
22. The Court Receiver, High Court Bombay is appointedReceiver and will take actual physical possession of flat C-501.
23. Mr Joshi for the 3rd Respondent insist that the flat is ready.Mr Saraogi for the Petitioner insists that it is not. The Receiver willvisit the flat and will submit a report including as to whether or notwiring has been completed with the necessary switches and outletsand whether there is power supply. The Receiver should notewhether there is basic finishing such as flooring, painting of walls,doors and windows etc. A set of photographs should also beprovided. It is acceptable if those photographs are shown to us on adigital device rather than have them printed.
24. As to the water supply, since there is presently no possibilityof linking to the municipal water mains at least for several weeksfrom now, the 3rd Respondent developer will ensure that there is aseparate hygienically treated water tank for storage of drinking waterand that it is filled with water provided by the MCGM in its ownspecial drinking water supply tankers. If there is a shortfall or anyinadequacy, the 3rd Respondent builder will at its cost obtaindrinking quality water supply from any private water supplier andwill not be entitled to recover these costs from any residentwhatsoever. The provision of free 20 litre Bisleri bottles is tocontinue until further orders. Page 14 of 15
17th August 2022 8-OSWPL-21683-2022.DOC
25. As to the MCGM, we will require an explanation on Affidavitas to how it issued this Part Occupancy Certificate. We specificallyrequire an explanation from the gentleman instructing Mr Patiltoday as to whether he personally inspected the site, and, if so,whether he checked if the 3rd Respondent has made arrangementsfor connecting to the municipal drinking water mains or not. TheMCGM affidavit is to be filed by 23rd August 2022.
26. The Petitioner will be entitled to continue in transitaccommodation at the 3rd Respondent’s cost until further orders ofthis Court. Mr Joshi agrees on instructions that this will be done.No services that have been made available to the Petitioner are to bediscontinued.
27. We permit the 3rd Respondent and Mr Joshi to chalk out aviable action plan for resolving these issues. That proposal musthave full particulars and details, including time-lines. We willconsider the proposal on the next date. We make it clear that anyproposal we accept will be treated as a solemn undertaking to theCourt.
28. We are not going to dispose of this matter but will list itperiodically for compliance.
29. List the matter on 24th August 2022.
(Gauri Godse, J) (G. S. Patel, J) Page 15 of 15 17th August 2022